Well construction intelligence · Made in Germany

Drilling decisions, backed by evidence.

BOHRSICHER brings the daily drilling report, the well plan and the service schedule into one record, and gives your wellsite supervisor an AI brief with sources. The decision stays with your crew.

Oil & gas · Geothermal · Underground Used on 4 continents Hosted in Germany

Two years in the field

Since the first pilot well in 2024

0

wells supported, from planning to handover

0%*

less non-productive time than offset wells

0 h*

saved per rig per day on reports and coordination

$0 M*

in invoice variances flagged before approval

9 rigs4 regions140+ field and office users3 well types
* Average across pilot projects 2024–2026. Indicative values; customer-approved case figures on request.
The problem

One shift. Five sources. No single truth.

At 06:00 the supervisor has to decide the next operation. The facts are spread across reports, spreadsheets, e-mails and phone calls, and the reasoning is lost by the next crew change.

Today

  • ×DDR as PDF, tour sheet on paper, plan in a separate file
  • ×Service crews booked by e-mail and phone, conflicts found late
  • ×NPT and flat time explained after the well, not during it
  • ×Field tickets approved without a check against the DDR
  • ×Decisions made by phone, with no record of why

With BOHRSICHER

  • ✓One well record, every number matched to its source
  • ✓Upcoming operations with readiness and crew conflicts across rigs
  • ✓Expected vs. actual time live, with a P10–P90 forecast
  • ✓Ticket compared with the DDR and agreed rates before the invoice
  • ✓AI brief with evidence; the decision is logged with owner and time
The platform

From the drilling program to the paid invoice.

Six modules on one data model. Start with one, add the rest when your team is ready.

01 · Well record

Every number traced to its source.

BOHRSICHER reads the DDR, tour sheets and program revisions, matches them and flags what needs review.

06:00Daily Drilling Report #042Matched
06:00Rig 07 tour sheetMatched
06:20Service scheduleNeeds review
02 · Performance

Where did we gain or lose time?

Expected vs. actual, flat time and NPT, per activity.

03 · Upcoming operations

Readiness before commitment.

Sequence, equipment checks and crew conflicts across rigs.

04 · AI advisory

An AI brief you can check. Never a black box.

Every recommendation shows its sources and a confidence level. The supervisor approves, changes or rejects it, and the reason is kept.

“Confirm the cement crew for Rig 07 by 07:30. Keep the casing run provisional until the equipment check closes.”
DDR #042Service scheduleCasing readiness log
05 · HSE

Observations that get closed.

Each observation is linked to the rig, work area and source record, with an owner, a due date and verified close-out.

06 · Inventory & field tickets

From ticket to invoice, checked.

Project and wellsite inventory, rental days, and every ticket compared with the DDR and the agreed rate. Example: pump rental 3 days × $180 expected, $630 submitted, +$90 flagged.

Interactive demo

One well. One shift. One decision.

Take over at 06:20. Rig 07 is 120 m from section TD and another rig needs the same cement crew. Check the records, compare the options and approve the plan.

Rig 07 / Well A-14
06:20 local · Morning shiftSample data

Trace the shift to its source.

Select a record to see what was checked, who owns the follow-up and which inputs the forecast uses.

Latest reported depth2,780 m MDDDR and tour sheet match
Section TD2,900 m MD120 m remaining
Casing readinessPendingEquipment check open

Well record

TimeSourceStatus

Where did we gain or lose time?

Depth vs. time for the last 24 hours against the Expected Time baseline, with the forecast to section TD.

Activity time11.25 hlast 12 h report
NPT0.75 hequipment wait
On-bottom ROP33–45m/h, recent stands
vs. baseline−30 mbehind expected depth
ActualExpected Time baselineNPT: equipment waitForecast P10–P90

Which crew window can we secure?

Rig 07 and Rig 04 both need the same cement crew. Pick an option to see what it does to both rigs.

Select an option to compare the impact.

Evidence for the WSS decision.

The brief is a suggestion. The wellsite supervisor reviews the sources and records the decision.

AI BRIEF · 06:21

Confirm the cement crew for Rig 07 by 07:30. Keep the casing run provisional.

Confidence medium–high
  1. Section TD expected 09:00–10:00 at current ROP of 33–45 m/h (DDR #042).
  2. Cement crew is booked for Rig 07 15:00–17:00 and Rig 04 16:00–18:00: 1 h overlap.
  3. Casing equipment check is still open (log 06:15). The casing run cannot be committed yet.
  4. Option A costs Rig 04 about 1 h of waiting; option B costs Rig 07 about 3 h.
DDR #042Tour sheetService schedule 06:20Casing readiness log 06:15Program §4.3

Why the AI says this

BOHRSICHER only uses records from this well and program. Each statement links to its source, and the brief shows what is still unknown.

Still unknown

  • Result of the casing equipment check
  • Whether the service company has a second crew

Rule

No recommendation becomes an instruction until a named person approves it.

Observations, actions and follow-up.

Open items stay visible to the wellsite team and the office until they are verified.

Dropped-object check, monkey boardClosed · verifiedOwner: Driller · verified 05:40 · photo attached
Housekeeping, mud pit walkwayAction due 12:00Owner: Toolpusher · linked to tour sheet 06:00
Near miss: pinch point during pipe handlingUnder reviewOwner: HSE Advisor · toolbox talk planned 13:30

Handover, written for you.

Drafted from the records of this shift. The outgoing supervisor edits and signs it.

RIG 07 / WELL A-14 · Handover 18:00 (draft)
Depth: 2,780 m MD at 06:00 · section TD 2,900 m MD
Forecast: section TD 09:00–10:00 (P10–P90)
Performance: ROP 33–45 m/h · NPT 0.75 h (equipment wait)
Decision: [pending WSS approval] cement crew for Rig 07
Open: casing equipment check · HSE action, mud pit walkway (due 12:00)
Lesson: confirm shared crews 8 h before section TD

Interactive demo with sample data. Product interface shown in English.

AI assistant

Ask BOHRSICHER.

Ask about this shift in plain language. Every answer names the records it comes from.

Pick a question on the left. Answers come from the Rig 07 sample data.

Field and office

The same shift, from each seat.

Everyone starts from the same well record and sees what their decision needs.

Wellsite supervisor

Can I commit to the next operation?

Check casing readiness and the crew call-by time, review the sources behind the AI brief, record the decision.

Drilling engineer

Where did we gain or lose time?

Trace each variance to the activity and the DDR. Separate drilling performance, planned flat time and NPT.

Operations coordinator

Which crew window can we secure?

Compare demand across rigs, see the overlap and what a later slot does to the call-by time.

Drilling manager

Which decision needs follow-up?

See which rig has a provisional window, what could change it and who owns the next action.

Savings calculator

What is one hour of rig time worth to you?

Enter your own numbers. The estimate uses a conservative share of the NPT reduction seen in our pilots.

Industry wells often report 10–20%.
Pilot average: 11%. Default is set slightly lower.
Potential savings per year—
Rig time recovered—
Current NPT cost per year—

Estimate: rigs × spread rate × 330 operating days × NPT share × reduction. Excludes savings from reporting time and invoice checks.

Test it on one rig
Made in Germany

Engineered in Germany. Built for the wellsite.

Your drilling data is your competitive advantage. We treat it that way.

Hosted in Germany

Data stays in EU data centres. Private cloud or on-premises installation for operators who need it.

GDPR by design

Data processing agreement, role-based access and data minimisation from day one.

SSO and MFA

Sign in with Microsoft Entra ID or your identity provider. Multi-factor authentication for every user.

People decide, AI advises

Every recommendation shows its sources and needs a named approver. AI answers are tested for accuracy before each release.

Complete audit trail

Who changed what, when and why: for each record, decision and approval.

Secure development

Code review on every change, regular penetration tests, and an ISO/IEC 27001 certification roadmap.

Connects to the tools you already use

WITSMLDDR import (Excel, PDF)SAPMicrosoft Power BIMicrosoft TeamsREST API
Field experience

Proven on rigs in four regions.

From horizontal oil and gas wells to deep geothermal projects.

North AmericaField use · 11 wells
South AmericaField use · 6 wells
Southeast AsiaField use · 4 wells
EuropeGeothermal pilot · 2 wells
Oil & gasHorizontal well construction
GeothermalDeep and closed-loop wells
Underground constructionDrilling for underground infrastructure
30-day pilot

Start with one rig. Decide with your own numbers.

No long tender, no change to your current process during the pilot.

  1. WEEK
    1

    Connect

    We import your DDRs, drilling program and service schedule. Your team gets access on day 5.

  2. WEEK
    2

    Run alongside

    BOHRSICHER runs beside your current reporting. Supervisors use the AI brief at shift start.

  3. WEEK
    3–4

    Measure

    We compare NPT, reporting time and ticket checks with your offset wells.

  4. DAY
    30

    Decide

    You get a pilot report with your figures and decide whether to roll out.

Request a demo or pilot

Tell us about your operation. We reply within one business day.

Required
Enter a valid e-mail
Required
Please confirm to continue
Sending failed. Please try again or write to us by e-mail.
✓

Thank you! Your request has been sent.

We will reply within one business day.

✓

Your request is ready.

Send it to us by e-mail, or copy it into your mail program:


        
      
FAQ

Questions from drilling teams

How long until the first rig is live?

Usually five working days. We import your existing reports and program; your team does not need to change templates for the pilot.

Does the AI make decisions on the rig?

No. The AI prepares a brief with sources. A named person approves, changes or rejects it, and that decision is recorded.

Which data do you need?

The daily drilling report, the drilling program, the service schedule and, for invoice checks, field tickets and agreed rates. Real-time WITSML data is optional.

Where is our data stored?

In data centres in Germany by default. Operators with stricter rules can run BOHRSICHER in their own cloud or on premises.

Does it work for geothermal and underground projects?

Yes. The well record, planning, HSE and ticket modules work the same way; only the activity codes and baselines change.